Bridge Facts
Bridge Type: Post-tensioned single cell concrete box girder
Location: PEI, Canada
Structural Engineer: Jean Muller
Construction Completed: 1997
Total Length: 12.9 km (250 m longest span)
Bridge Engineer
Bridge Type: Post-tensioned single cell concrete box girder
Location: PEI, Canada
Structural Engineer: Jean Muller
Construction Completed: 1997
Total Length: 12.9 km (250 m longest span)