Bridge Facts
Main Span Type: Steel truss cantilever
Approach Span Type: Prestressed concrete girder
Structural Engineer: SNC
Construction Completed: 1962
Total Length: 3.4 km (215 m main span)
Bridge Engineer
Main Span Type: Steel truss cantilever
Approach Span Type: Prestressed concrete girder
Structural Engineer: SNC
Construction Completed: 1962
Total Length: 3.4 km (215 m main span)